Deliverables

Deliverable (number) Deliverable name Work package number Short name of lead participant Type Dissemination level Delivery date

 

D1.1 Applications, Solution specifications WP1 ALU-I R PU M6
D1.2 System architecture and specifications WP1 ALU-I R PU M9
D1.3.1 Sub-System and interconnections specifications WP1 ALU-I R PU M12
D1.3.2 Sub-System and interconnections specifications WP1 ALU-I R PU M20
D1.3.3 Sub-System and interconnections specifications WP1 ALU-I R PU M27
D2.1.1 Report on D-band radio front end stage design WP2 III-V Lab

 

R PU M09
D2.1.2 First report on D-band transceiver front end functional stage tests, WP2 III-V Lab

 

R PU M21
D2.1.3 Final report on D-band transceiver front end functional stage tests WP2 III-V Lab

 

R PU M28
D2.2.1 Report on D-band frequency synthesis design

 

WP2 UniPV R PU M09
D2.2.2 First report on D-band frequency synthesis test

 

WP2 UniPV R PU M21
D2.2.3 Final report on D-band frequency synthesis test

 

WP2 UniPV R PU M28
D2.3.1 Report on radio front end integration design WP2 CEIT

 

R PU M21
D2.3.2 First report on D-band radio front end integration tests

 

WP2 CEIT R PU M28
D2.3.3 Final report on D-band radio front end for antenna beam steering tests WP2 CEIT R PU M33
D3.1 Proposal for optimal antenna configuration. WP3 VTT R PU M03
D3.2 Optimised antenna element candidates with simulation and measurement results for array development.

 

WP3 VTT R PU M12
D3.3 Optimised antenna array design with simulation and measurement results for final integration

 

WP3 VTT DEM PU M26
D3.4 Test system for digital control of beam steering demonstrators.

 

WP3 CEIT DEM PU M30
D4.1 The first version of prototype

 

WP4 ERZIA DEM PU M27
D4.2 The final prototype assembled.

 

WP4 ERZIA DEM PU M34
D5.1 Design of testbed architecture, spec. and planning

 

WP5 ALU-I R PU M26
D5.2 Test execution and validation

 

WP5 ALU-I DEM PU M36
D6.1 Electronic Platform

 

WP6 UniPV DEC PU M3
D6.2 Dissemination Plan (R, M12, M24, M36)

 

WP6 UniPV R PU M12 M24 M36
D6.2 Exploitation plan WP6 UniPV R PU M12 M24 M36
D2.3 Standardization activity WP6 UniPV R PU M12 M24 M36
D7.1 Project Management manual

 

WP7 VTT R PU M3
D7.2 Project Quality Assurance Manual

 

WP7 VTT R PU M4
D7.4 First year Annual Report

 

WP7 VTT R PU M12
D7.5 Second year Annual Report

 

WP7 VTT R PU M24
D7.6 Final Report

 

WP7 VTT R PU M36