Deliverables

Deliverable (number) Deliverable name Work package number Short name of lead participant Type Dissemination level  

Delivery date

 

D1.1 Applications, Solution specifications WP1 ALU-I R PU M6
D1.2 System architecture and specifications WP1 ALU-I R Confidential M9
D1.3 Sub-System and interconnections specifications WP1 ALU-I R Confidential M12
D1.4 Sub-System and interconnections specifications WP1 ALU-I R Confidential M20
D1.5 Sub-System and interconnections specifications WP1 ALU-I R Confidential M27
D2.1 Report on D-band radio front end stage design WP2  

III-V Lab

 

R Confidential M09
D2.2 First report on D-band transceiver front end functional stage tests, WP2  

III-V Lab

 

R Confidential M21
D2.3 Final report on D-band transceiver front end functional stage tests WP2  

III-V Lab

 

R PU M32
D2.4 Report on D-band frequency synthesis design WP2 UniPV R Confidential M09
D2.5 First report on D-band frequency synthesis test WP2 UniPV R Confidential M21
D2.6 Final report on D-band frequency synthesis test WP2 UniPV R PU M32
D2.7 Report on radio front end integration design WP2  

CEIT

 

R Confidential M26
D2.8 First report on D-band radio front end integration tests WP2 CEIT R Confidential M37
D2.9 Final report on D-band radio front end for antenna beam steering tests WP2 CEIT R PU M33
D3.1 Proposal for optimal antenna configuration. WP3 VTT R Confidential M03
D3.2 Optimised antenna element candidates with simulation and measurement results for array development. WP3 VTT R Confidential M12
D3.3 Optimised antenna array design with simulation and measurement results for final integration WP3 VTT DEM PU M26
D3.4 Test system for digital control of beam steering demonstrators. WP3 CEIT DEM PU M38
D4.1 The first version of prototype WP4 ERZIA DEM Confidential M38
D4.2 The final prototype assembled. WP4 ERZIA DEM Confidential M41
D5.1 Design of testbed architecture, spec. and planning WP5 ALU-I R Confidential M31
D5.2 Test execution and validation WP5 ALU-I DEM PU M42
D6.1 Electronic Platform WP6 UniPV DEC PU M3
D6.2 Dissemination Plan WP6 UniPV R PU M12 M24 M42
D6.3 Exploitation plan WP6 UniPV R PU M12 M24 M42
D6.4 Standardization activity WP6 UniPV R Confidential M12 M24 M42
D7.1 Project Management manual WP7 VTT R PU M3
D7.2 Project Quality Assurance Manual WP7 VTT R PU M4
D7.3 Knowledge management guide WP7 VTT R Confidential M4
D7.4 First year Annual Report WP7 VTT R Confidential M12
D7.5 Second year Annual Report WP7 VTT R Confidential M24
D7.6 Final Report WP7 VTT R PU M42
D7.7 Data management plan WP7 VTT R PU M6